Swinging "pendulum" boom conveyor, 200 feet long, hopper and five-yard shovel of a lateral to collecting conveyor at the 1840 level in Brett pit. In upper part is similar set-up.
Description
Seen here is the sorting process meant to separate fine concrete materials from large boulders that the conveyor would then separate out as the shovel unloaded material onto the hopper.