Caterpillar tractor and 16-wheeled buggy haul raw aggregate at the Brett Gravel Pit. This method of aggregate transportation was used prior to installation of conveyor system.
Description
Tractor hauling aggregate material for construction of the Grand Coulee Dam to be delivered to the conveyor system that would then take it to sorting plant and then to the new el. 1180 concrete mixing facility located at the dam site.