The installation of the penstock lining in the tunnel has been completed. The space between the lining and the walls of the tunnel will be backfilled with concrete.
Description
The installation of the penstock lining in the tunnel has been completed. The space between the lining and the walls of the tunnel will be backfilled with concrete.