General view of the left powerhouse at the start of the 1940 construction program. The control bay has not been built above the el. 1012 level and construction is still in progress on the service bay.
Description
General view of the left powerhouse at the start of the 1940 construction program. The control bay has not been built above the el. 1012 level and construction is still in progress on the service bay.